Does Cpi Increase Or Decrease With Disinflation,
Asus Monitor Settings For Gaming,
Articles N
THE SIGNS SHOULD BE POSTED ON ALL POLES AND DRIVE RAILS ON THE SEGMENT AFFECTED INDICATING THE DATE OF THE CHANGE, THE NEW REGULATIONS AND A TELEPHONE NUMBER TO OBTAIN INFORMATION. Chapter 4 describes the processes for executing work in the streets, after permits and approvals are obtained, and the enforcement actions NYC DOT may take to safeguard city streets. With advance notice of proposed excavation work, NYC DOT can sequence the timing of the large number of roadway and utility works being undertaken across the city. Drawings (Downloads) Standard Sheets - Metric - SI; Standard Sheets - English - USC; IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED. RESTORATION MUST BE FULL DEPTH CONCRETE AS PER FIRST AVE SPEC,1042A,B & 1050. WALKWAY MUST MEET NYCDOT SPECIFICATIONS. Foundation MaterialWhen replacing a concrete sidewalk, the foundation material may be retained and graded to the required subgrade. Fax: (718) 430-4663 Long Island City, NY 11101 OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE. 811 or 800-272-4480. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. Working Without a Permit If the permittee has been issued a summons/NOV for working without a permit, all future permit requests may be placed on hold until the applicant takes out a permit of record for the work that was performed. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. (212) 839-8857 Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. An overview of major permit categories, is provided below. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. WALKWAY IN CLOSED LANE. Customer Service: (718) 802-3675, Manhattan 1400 Williamsbridge Road, 1st floor SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. If the installed canopy passes final inspection, HIQA releases the CAN hold on the canopy maintenance permit and notifies the original applicant. WORK 7PM TO 11PM MON. Further information is available in Section 2-02 (c) of Highway Rules. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. Include the names of any expediter. Form must be notarized. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. Click here to download. ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. Weekly Milling and Resurfacing and Concrete Repair SchedulesNYC DOT weekly milling and resurfacing schedules are available online. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. The second option is available for applicants who do not have the technology to use the above procedure. In addition, a second permit must be applied for to maintain the canopy. Typically, permits must be kept at the work site or designated field headquarters at all times and must be made available for inspection. Fax: (212) 788-3086, New York State Department of Environmental Conservation (DEC) This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. 22 Reade Street, 6th Fl. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Upon completion of the inspection, HIQA makes a final determination as to whether the location is suitable for a canopy placement. WORK 7 PM-10 AM WEEKNIGHTS. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. WORK 9 AM TO 7 PM EXCEPT SUNDAY. Applicants who are registered as permittees (see Section 3.2) and are registered for on-line permitting can log-in to NYCStreets and request an EAN. Report a problem. 10 Richmond Terrace, Room 309 LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. The applicant must satisfy all of the requirements listed in section 2-02(a) (3) of the. For Further Information: ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. Any corrective action required by the CAR must be performed within 30 daysof the issuance of the CAR. Raising the base of the traffic signals or street light poles reduces the chance that the electrical components of the poles will be submerged in salt water during future flooding events. There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. Applications for most permit types can be submitted to the Manhattan Central Permit Office. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. HIQA also releases many holds. Office hours: 8:30 AM-5:00 PM, Queens SIGNS SHALL BE POSTED MIN OF 48-HRS PRIOR TO START OF WRK & IMMEDIATELY REMOVED UPON COMPLETION OF WRK OR PERMIT EXPIRATION. Additional requirements are contained in Sections 2-02 and 2-11 of the Highway Rules and should be consulted before any work is performed on the street. NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. Contact information can be found in Appendix C, NYC DOT Contact Information. WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. View the most recent version of Drawing #H1029 of the NYC DOT. NYPD AGENTS AND VMS BOARDS REQUIRED AS PER MEC01-36. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. To request release of a DOF hold, the permittee must contact Finance and either make a payment or agree to a payment schedule for all fees associated with the outstanding summonses/NOVs. (212) 839-2399 If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. See Chapter 3Permits and Approvals for more information. APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) Further information is available in Section 2-02 (h) of the Highway Rules. Notes: 1. A scale of one to five $ symbols is used rather than specific monetary amounts because actual costs are subject to change. Excavators use those markings to help identify underground facility locations in order to promote public safety and to prevent damage to public and private property. (16 NYCRR Part 753), Additional information can be obtained by contacting New York 811 at 800-272-4480, or visiting the New York 811 Website.