Field Club Membership Fees, Articles S

This section contains copies of Class 3 contracts for projects being undertaken by Sydney Metro. Two consortia, John Holland, CPB Contractors and Ghella Australia Joint Venture (JHCPBG JV) and Gamuda and Laing ORourke Australia Joint Venture (GALC JV) are competing for the nine-kilometre-long Western Package between Westmead to Sydney Olympic Park. By the end of the decade, the Sydney Metro network is to be expanded to include 46 stations and more than 113km of metro for the city. Work on Sydney Metro West started at The Bays in 2020, with mega tunnel boring machines to be in the ground before the end of this year. From there, the remaining two consortia will again bid for the Western Tunnelling Package which includes building 9 kilometres of twin tunnels from Westmead to Sydney Olympic Park. googletag.cmd.push(function() { Then the first of four tunnel boring machines is expected to be in the ground before the end of 2022. The New South Wales Government has shortlisted three consortia to deliver Sydney Metro West's first two major tunnelling packages. Unauthorised reproduction is prohibited, on Sydney Metro shortlists consortia for Eastern contract, Iplex Australia appoints new general manager. Transport for NSW recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and care of Country. The NSW Government today (8 November 2022) announced the two consortiums shortlisted to tender for the delivery of the Sydney Metro Hunter Street Station, and the two buildings above in in the Sydney CBD. copies of Class 3 contracts disclosed on the NSW Government eTendering website at, copies of Class 3 contracts for Infrastructure and Place Division projects with Contract Award Notices elsewhere on the eTendering website, redaction schedules, if applicable, for each contract describing the general nature and reasons for non-disclosure of confidential informationand. Bringing you the latest stories from across the road, rail, port, airport, urban and utility sectors. The consortia have been shortlisted to deliver the Eastern Tunnelling package which includes 3.5km of twin tunnels under Sydney Harbour between The Bays and the Sydney CBD and the excavation of Pyrmont and Hunter Street stations. Please note that agencies are not required to publish confidential information in their contracts register. We've shortlisted three groups for the tender to build 3.5km of new twin metro railway tunnels under Sydney Harbour between The Bays and the Sydney CBD - the | 10 comments on LinkedIn Tenders announced in new Sydney Metro West contracting approach John Thompson November 8, 2022 News, Rail, Spotlight, Transport 0 Sydney Metro will introduce a new contracting approach for the next stage of its Sydney Metro West - Australia's largest public transport project - announcing several upcoming contracts for construction and design. Shortlist for Hunter Street Precinct Development Partner announced, procurement for the remaining Metro West packages now underway. . The consortia have been shortlisted to deliver the eastern tunnelling package which makes up the final section of tunnelling. Following planning approval, construction works are set to start in The Bays later this year. Sydney Metro West will double rail capacity between greater Parramatta and the Sydney CBD, with a target travel time of about 20 minutes between the two centres. https://bit.ly/41FcEZs, The newly established High Speed Rail Authority (HSRA), an extension of the Federal Government, has begun recruiting board members to assist in the development of Australias high-speed rail network. https://bit.ly/3m1LCeg, The Federal and New South Wales Governments have announced the 57 projects that will share in the $312.5 million commitment to help rebuild damaged roads and transport infrastructure in 26 disaster-declared councils in northern New South Wales. The shortlisted companies for the contract of surface and civil alignment works were Acciona Construction Australia and CPB Contractors. The eastern tunnelling package contract is expected to be awarded by the end of 2022. This information was uploaded in March 2023 and is subject to change (including staging, funding, acquisitions, planning approvals, rail possessions . The 24km West Metro extension from Central to Parramatta and Westmead. 00013/11723 Transaction Management Services (PDF, 3.19 MB), Sydney Metro Sub Portion Early Completion Agreement (PDF, 992.54 KB), Sydney Metro City & Southwest TSE Contract General Conditions (PDF, 72.92 MB), Sydney Metro City & Southwest TSE Contract Schedules (PDF, 113.7 MB), Sydney Metro City & Southwest TSE Contract explanatory table (PDF, 366.65 KB), Sydney Metro City & Southwest TSE Contract Independent Certifier Deed (PDF, 18.65 MB), Sydney Metro City & Southwest TSE Contract Independent Certifier Deed explanatory table (PDF, 70.7 KB), Sydney Metro City & Southwest - Variation to the OTS2 Early Works Deed (PDF, 3.14 MB), Sydney Metro City & Southwest - Variation to the OTS2 Early Works Deed - Explanatory Table (PDF, 93.86 KB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume GIPA Act explanatory table (DOCX, 83.65 KB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 1 (PDF, 73.82 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 2 (PDF, 100.09 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 3 (PDF, 45.65 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 4 (PDF, 100.65 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 5 (PDF, 58.9 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-132 Volume 6 (PDF, 94.09 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume GIPA Act explanatory table (DOCX, 72.21 KB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 1 (PDF, 73.15 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 2 (PDF, 95.07 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 3 (PDF, 47.74 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 4 (PDF, 101.98 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 5 (PDF, 60.46 MB), Sydney Metro City & Southwest Demolition Contract Contract Number: SMCSW-131 Volume 6 (PDF, 64.97 MB), Sydney Metro City & Southwest TSE Deed of Variation (PDF, 34.09 MB), Sydney Metro City & Southwest TSE Deed of Variation - Explanatory Table (DOCX, 56.91 KB), Sydney Metro GC21 General Conditions of Contract (PDF, 11.68 MB), Sydney Metro GC21The Bays Road GC21 -Explanatory Table (PDF, 340.95 KB), Sydney Metro Retail Electricity Agreement (PDF, 699.89 KB), Sydney Metro Sydney Yard Access Bridge Contract SMCSW-141 GIPA Act Explanatory Table (DOCX, 78.84 KB), Sydney Metro Sydney Yard Access Bridge Project Contract & Schedules Volume 1 SMCSW-141 (PDF, 54.47 MB), Sydney Metro Sydney Yard Access Bridge Project Contract & Schedules Volume 2 SMCSW-141 (PDF, 46.88 MB), Sydney Metro Sydney Yard Access Bridge Project Contract & Schedules Volume 3 SMCSW-141 (PDF, 54.15 MB), Sydney Metro Sydney Yard Access Bridge Project Contract & Schedules Volume 4 SMCSW-141 (PDF, 36.23 MB), Sydney Metro Western Sydney Airport SBT Design & Construction Deed (PDF, 187.52 MB), Sydney Metro Western Sydney Airport SBT Deed - A Schedules (PDF, 7.95 MB), Sydney Metro Western Sydney Airport SBT Deed - B Schedules (PDF, 2.32 MB), Sydney Metro Western Sydney Airport SBT Deed - D Schedules (PDF, 517.86 KB), Sydney Metro Western Sydney Airport SBT Deed - E Schedules (PDF, 401.91 KB), Sydney Metro - Western Sydney Airport (SCAW D and C Deed Executed 1 March 2022 Redacted) (PDF, 19.82 MB), Sydney Metro - Western Sydney Airport (SCAW D and C Deed Schedule A) (PDF, 5.88 MB), Sydney Metro - Western Sydney Airport (SCAW D and C Deed Schedule B) (PDF, 1.54 MB), Sydney Metro - Western Sydney Airport (SCAW D and C Deed Schedule D) (PDF, 339.09 KB), Sydney Metro - Western Sydney Airport (SCAW D and C Deed Schedule E) (PDF, 274.95 KB), Sydney Metro - Western Sydney Airport (SCAW GIPA Explanatory) (PDF, 945.34 KB), Sydney Metro - Western Sydney Airport GIPA Explanatory Table PACs (PDF, 81.76 KB), Sydney Metro - Western Sydney Airports - GIPA Redaction PACs (PDF, 123.61 KB), Sydney Metro - Western Sydney Airports GIPA Explanatory Table (PDF, 925.55 KB), Sydney Metro West - Western Tunnelling Works Design and Construction Deed - Redacted (PDF, 168.69 MB), Sydney Metro West - Western Tunnelling Works - Explanatory table of redactions (PDF, 1.35 MB), Sydney Metro West Power Enabling Works Construct Only Package Contract ASP1 (PDF, 18.15 MB), SMW CTP Deed - Main Body (Executed version) (PDF, 23.88 MB), SMW CTP Deed - Schedules Part A - Schedules A1-A31 (Executed Version) (PDF, 6.36 MB), SMW CTP Deed - Schedules Part B - Schedules B1-B28 (Executed Version) (PDF, 1.23 MB), SMW CTP Deed - Schedules Part D - Schedules D1-D21 (Executed Version) (PDF, 7.52 MB), SMW CTP Deed - Schedules Part E - Schedules E1-E11 (Executed Version) (PDF, 4.02 MB), SMW CTP Deed - GIPA Explanatory Table (PDF, 771.76 KB), Waterloo Integrated Station Development Station Delivery Deed (PDF, 10.02 MB), Waterloo Integrated Station Development Station Delivery Deed -Explanatory Table (PDF, 383.79 KB), Waterloo Integrated Station Development Station Delivery Deed Schedules (PDF, 38.84 MB), Waterloo Integrated StationDevelopment - General Conditions (PDF, 10.95 MB), Waterloo Integrated StationDevelopment - Schedules A-C (PDF, 36.99 MB), Waterloo Integrated StationDevelopment - Schedules D-F (PDF, 17.28 MB), Waterloo Integrated StationDevelopment - GIPA Explanatory Table (PDF, 701.31 KB), Waterloo Integrated Station Development Metro Quarter Development Project Delivery Agreement - Deed of Variation No. The project will see tunnels built from Greater Parramatta to the Sydney CBD creating 10,000 direct and 70,000 indirect jobs. Further Sydney Metro West stations revealed, $955 Million Central Walk, Sydney Metro contract awarded. The New South Wales Government has shortlisted three consortia to deliver the final phase of tunnelling for the major transport infrastructure project in Sydney, Australia. Mail: Sydney Metro West, PO Box K659 Haymarket NSW 1240. Sydney Metro - West - Tunnel and Excavation - Eastern Package - Infrastructure Pipeline PRODUCED BY INFRASTRUCTURE PARTNERSHIPS AUSTRALIA Network error: Response not successful: Received status code 400 produced by projects Search Recent updates Popular searches charts Major projects Infrastructure Pipeline status Infrastructure Pipeline location The project will include the development of the station and the two buildings above, located in Sydney's CBD. Sydney Metro has today shortlisted three consortia to deliver the final piece of tunnelling for Sydney Metro West into the heart of the Sydney CBD. Sydney Metro snapshot: the view from above makes the huge machines down below look like toys. The East Moves West may be ordered from: Brookings Institution Press, 1775 Massachusetts Avenue, N.W., Washington, D.C. 20036 Telephone: 1-800/537-5487 or 410/516-6956 Internet: www.brookings.edu Library of Congress Cataloging-in-Publication data Kemp, Geoffrey. Sydney Metro West is a new 24-kilometre metro line with stations at Westmead Pre-tender design delivery of Trains, Systems, Maintenance and Operations (TSMO) for Metro West. The Eastern Tunnelling package will see tunnel boring machines cross under Johnstons Bay alongside the Anzac Bridge, before heading to the new Pyrmont station and then down and under Darling Harbour before reaching Hunter Street in the heart of the CBD, in between Wynyard and Martin Place. The shortlist includes: the Acciona Construction Australia and Ferrovial Construction join venture; Bouygues Construction, Vinci Construction Grand Projects and Soletanche Bachy International join venture; and the John Holland, CPB Contractors and Ghella joint venture. Martin Place excavation nears completion for Sydney Metro, Tenders open to build 50km of Sydney Metro tunnels, Last tunnel complete on Sydney Metro City and Southwest, Introducing Inside Construction Expo 2023, 2023 Australian Construction Achievement Award finalists announced, Multiplex supports local jobs with 14th Connectivity Centre, CJK Fire & Safety fights fire with prevention, Contractor awarded St George Hospital Redevelopment Stage 3, The importance of a comprehensive tender program, John Holland, CPB Contractors and Ghella Australia Joint Venture (JHCPBG JV), Gamuda and Laing ORourke Australia Joint Venture (GALC JV), Acciona Australia and Ferrovial Australia Joint Venture (AF JV). Required fields are marked *. TGS Media LtdThe Old LibraryWebster HouseDudley RoadTunbridge WellsTN1 1LEUnited Kingdom, Tunnelling Journal. The information made public on the eTendering website includes: Class 3 contracts must be published on the Transport for NSW website. Sydney Metro: Shortlist: John Holland, CPB Contractors and Ghella Australia Joint Venture, Gamuda and Laing O'Rourke Australia Joint Venture, and Acciona Australia and Ferrovial Australia Joint Venture . [ February 13, 2023 ] Design tender for Vilnius node launched [ February 13, 2023 ] Webuild consortium wins Trento rail bypass contract [ February 13, 2023 ] Egypt and . Despite how they look, they're actually full-sized excavators | 21 comments on LinkedIn John Holland Pty Ltd, CPB Contractors Pty Ltd & Ghella Pty Ltd joint venture (JCG JV). The contract is expected to be awarded in the first quarter of 2022. Acciona Ferrovial JV was awarded the Central Tunnelling Package after a competitive tender process. Work on Sydney Metro West started at The Bays in 2020, with mega tunnel boring machines to be in the ground before the end of this year. 2023 Infrastructure Magazine. Due to the scale of this mega project the tunnelling and excavation works have been separated into geographically specific contract packages between Westmead and Sydneys business district. Work on Sydney Metro West started at The Bays in 2020, with mega tunnel boring machines to be in the ground before the end of this year. . The project will support 14,000 construction jobs, including 250 apprentices. Ray Chan February 14, 2022, 11:52 am The New South Wales Government has shortlisted three consortia to deliver the Eastern Tunnelling package for Sydney Metro West project, which includes 3.5 kilometres of twin tunnels under Sydney Harbour between The Bays and the Sydney CBD. Sydney Metro West is on track to be completed in 2030. Systems Connect (a joint venture between UGL Engineering Pty Ltd and CPB Contractors Pty Ltd). Explore the Transport Infrastructure Pipeline 2027, filter by project type, scale, region and timelines to find and export the data that is relevant to you. Three JVs shortlisted for Sydney Metro West tunnelling contracts THE New South Wales (NSW) government has shortlisted three consortia to deliver the first two major tunnelling packages for the Sydney Metro West project from Greater Parramatta to Sydney city centre. Stage 2 of the Parramatta Light Rail project includes 15 stop locations from Camellia to Sydney Olympic Park and will connect to the future Metro West and heavy rail in Parramatta and Sydney Olympic Park, and ferry services at Rydalmere and Wentworth Point. Sydney Metro has shortlisted three consortia to deliver the final piece of tunnelling for Sydney Metro West. The successful tenderer will build six new metro stations and elements of the surrounding precincts, the stabling and maintenance facility, provide rail infrastructure and systems required for the supply, commission and operations of the new trains and also run the Sydney Metro to Western Sydney Airport line when operational. Delivering new rail services for the first time at Burwood North, Five Dock, The Bays and Pyrmont. The Eastern Tunnelling Package contract is expected to be awarded by the end of 2022. proactive contract disclosure of construction-related contracts. This section contains contracts related to projects being undertaken by the Transport for NSW Infrastructure and Place Division, including: For more information on these contracts or any Contract Award Notices on Transport Projects Contracts please email IP.GIPA@transport.nsw.gov.au (Attn: Project Information Officer). You can find copies of class 3 contracts below. A new metro station at Westmead - one of Australia's largest health and education precincts. The caretaker period for the NSW Election commenced on 3 March 2023. Sydney Metro West will double rail capacity between greater Parramatta and the Sydney CBD, with a target travel time of about 20 minutes between the two centres. 6 Sep 16 Lendlease has formally signed a 103m contract build a landmark office scheme at 245 Hammersmith Road in West London. The 24-kilometre new underground rail connection between the CBDs of Parramatta and Sydney will double rail capacity between the two CBDs, connecting the stations at Westmead, Parramatta, Sydney Olympic Park, North Strathfield, Burwood North, Five Dock, The Bays, Pyrmont and Hunter Street in the Sydney CBD. Community members are invited to submit their feedback on the proposal to Sydney Metro by emailing sydneymetrowest@transport.nsw.gov.au or writing to: Sydney Metro West PO BOX K659 Haymarket NSW 1240. ; The western tunnelling package will be awarded soon after a shortlist was announced last year. The contracts will require tunnellers, electricians, plumbers . jQuery(".webskin-condition-class > div").css("background-color", backColor); The final piece of the project is made up of the Eastern Tunnelling package, which includes 3.5 km of twin tunnels under Sydney Harbour, between The Bays and Sydney CBD, as well as the excavation of Pyrmont and Hunter Street stations. Email: sydneymetrowest@transport.nsw.gov.au. The contract award follows a competitive tender process involving three shortlisted companies. The Brookfield Consortium (comprised of Brookfield Properties (Devco) Australia Brookfield Property Partners L.P., Brookfield Properties and Brookfield Asset Management), The Metropolis Consortium (comprised of Hemmes Hermitage Pty Limited, Hemmes Trading Pty Limited, Mirvac Office Developments, Telado, CFT No. Your submissions should reach Sydney Metro by 29 May 2020 and include: Your name and address. November 7, 2022, 3:19 pm. The Eastern Tunnelling package will see TBMs cross under Johnstons Bay alongside the Anzac Bridge, before heading to the new Pyrmont station and then down and under Darling Harbour before reaching Hunter Street in the heart of the CBD, in between Wynyard and Martin Place. The successful tenderer will build more than 10 kilometres of viaducts, bridges and embankments that will support railway tracks and associated infrastructure. Sydney Metro - Western Sydney Airport - Independent Certifier Services - SM2021/012 Tender Details Sydney Metro is inviting Expressions of Interest from suitably experienced and qualified organisations interested in providing independent certification services for the Sydney Metro - Western Sydney Airport major works contracts, being: 1. City of Westminster moves against basement builders. The organisations shortlisted to tender for the SSTOM package are: The Sydney Metro Western Sydney Airport project will support 14,000 construction jobs, including 250 apprentices. Photo: Sydney Metro. The New South Wales Government on Friday shortlisted three consortia to deliver the Eastern Tunnelling package for Sydney Metro West project, which includes 3.5 kilometres of twin tunnels under Sydney Harbour between The Bays and the Sydney CBD. Theres an opportunity with the new Hunter Street Station to create a world-class transport precinct which will become a gateway to jobs, business and tourism.. This is an exciting visionary project creating a seamless interchange for commuters travelling into George St with connections to light rail, train services at Wynyard and the new Sydney Metro City & Southwest station at Martin Place, Mr Elliott said. commercial-in-confidence provisions of a contract, any matter that could affect public safety or security, or. Got a lead? Roads and Maritime Services Revenue Contracts, Rural and Regional bus service contract (very small) (PDF, 1.56 MB), Rural and Regional bus service contract (small) (PDF, 1.51 MB), Rural and Regional bus service contract (medium) (PDF, 2.08 MB), Rural and Regional bus service contract (large) (PDF, 1.98 MB), Sydney Trains Class 3 contracts disclosed under the GIPA act. The shortlisted JVs are: Minister for Transport, Veterans and Western Sydney David Elliott . 2023 All Rights Reserved. setTimeout(function() { ISD 17 6580 Attachment B Combined Redacted Variations 1-62 For Disclosure Redacted (PDF, 543.12 KB), AMS Trackside Network Rollout Data Design - Areas 1, 6, 7, 8 and 9 -Combined Redaction Schedule (PDF, 432.42 KB), Automatic Train Protection Program Professional Services Contract Variation 1: Additional Training for TfNSW Personnel (PDF, 7.68 MB), Automatic Train Protection Program Professional Services Contract Variation 1: Additional Training for TfNSW Personnel-Redaction Schedule (PDF, 253.28 KB), Circular Quay Precinct Renewal - Technical Advisor - Redaction Schedule (PDF, 106.51 KB), Newcastle Light Rail- Rolling Stock Supply - Amendment and Restatement Deed (Volume 1) CAN ID NLR - Rolling Stock Supply (PDF, 27.97 MB), Newcastle Light RailRolling Stock Supply Variations (Volume 2) (PDF, 855.87 KB), Newcastle Light RailRolling Stock Supply Amendment and Restatement Deed Combined Redaction Schedule (PDF, 193.4 KB), Parramatta Light Rail (Stage 1) -Supply Operate and Maintain Contract - CAN ID ISD-18-6720 (PDF, 265.07 MB), Parramatta Light Rail (Stage 1) - Remediation Contract -(6 Grand Avenue Camellia) -ISD 17-6467 (PDF, 16.16 MB), Parramatta Light Rail (Stage 1) - Remediation Contract - Deed of Amendment (PDF, 16.79 MB), Parramatta Light Rail (Stage 1) Supply Operate and Maintain Contract Deed of Release and Amendment (PDF, 4.47 MB), Parramatta Light Rail (Stage 1) Supply Operate and Maintain Contract Deed of Release and Amendment Redaction Schedule (PDF, 223.46 KB), Parramatta Light Rail (Stage 1) (PDF, 1.66 MB) (PDF, 1.66 MB)Infrastructure Contract Deed of Release (PDF, 1.66 MB), Parramatta Light Rail (Stage 1) Infrastructure Contract Deed of Release Redaction Schedule (PDF, 515.69 KB), Rozelle Interchange and Western Harbour Tunnel Enabling Works Contract (Redacted), Sydney Gateway Stage 1 and Stage 3 Design & Construct Deeds, Sydney Gateway Stage 1 and Stage 3 Independent Verifier Deeds.